Product Video
Products Description
|
Brand |
Product Name |
Model |
Weight/pc |
Part Number |
|
Komatsu
|
Track Chain |
PC2000 |
3600KG |
21T-32-O0020 |
We supply all models of komatsu excavator track chain. If you need to know other models, please contact us.
|
Product Name |
Track Chain |
|
Part Number |
21T-32-O0020 |
|
Origin |
Japan
|
|
Brand Name |
STONE |
|
Model |
PC2000 |
|
Price |
Negotiable |
|
Packing Details |
Standard Export Packing |
|
Delivery Time |
0-30 Days |
|
Payment Term |
L/C, T/T |
|
Price Term |
FOB, CIF, CFR |
|
Supply Capacity |
50,000 PCS/Month |
|
Minimum Order Quantity |
1 PC |
|
Material |
High Quality Steel |
|
Technology |
Precision Machining |
|
Surface |
Treatment Anti-Corrosion Coating |
|
Hardness |
HRC 48-52 |
|
Quality |
Original Factory Standard |
|
After-Sales Service |
Full Support, Online Service |
|
Color |
Customizable |
|
Application |
Excavator
|
|
Customizable |
including customized materials, surface treatment and specifications |
Product related information

Komatsu PC2000-8
mining excavator
Specifications:
Engine Power:728/976 kW/HP
Operating weight (kg):195-204 t.
Bucket Capacity:15.3m³
Digging Depth:9,24 m
Track
Number of shoes (each side):8
Number of carrier rollers (each side):8
Shoe width (standard)(mm):810mm
![]() |
![]() |
Details:
| Type | A | B | C |
| TCSL | 317,5 | 96 | 103 |
| D | E | ØF | ØR |
| 208 | 274 | 33,8 | 117 |
| ØH | I | L | M |
| 70,4 | 148 | 304 | 199 |
| N | O | P | ØG |
| 110 | 353 | 359 | 113 |
| M.P.Type | |||
| PS |
CROSS REFERENCE (Original codes):
| BERCO | KM3458/49 |
| ITM | E40470A0M00049 |
| KOMATSU | 21T-32-00020 |
| KOMATSU | 21T-32-00021 |
| KOMATSU | 21T-32-00022 |
| KOMATSU | 21T-32-00023 |
| KOMATSU | 21T-32-00024 |
| KOMATSU | 21T-32-00025 |
Product structure design
Select high-quality steel and follow the original factory standards
High-strength alloy steel
Komatsu Track Chain uses special alloy steels such as 35MnBN. After quenching and tempering, the core hardness reaches HRC32-36, combining toughness and deformation resistance.
Surface hardening treatment
The surface of the chain link is subjected to medium frequency quenching, the hardness is increased to HRC50-54, the hardened layer depth is 6-12mm, and the wear resistance is significantly enhanced.
Precision forging process
Through the fully automated forging production line, the geometric accuracy error of the track chain links is ensured to be ≤0.05mm, improving overall stability.
Carburizing to strengthen the pin hole
The inner wall of the pin hole is carburized to form a hardened layer with a depth of 3-5mm, which reduces the friction loss between the pin and the bushing.
Heat treatment consistency
A computer-controlled continuous heat treatment furnace is used to ensure that the performance fluctuation of each batch of Komatsu Track Chain links is ≤±2%.
Impact-resistant structural design
The chain links adopt X-shaped cross-section to disperse stress concentration and can withstand rock impact energy ≥800J.
Structure and performanc
Enhanced adaptability to extreme working conditions
High load capacity
The static load-bearing capacity of a single link of track chain is ≥50 tons, and the dynamic impact load is ≥30 tons, which is suitable for mining conditions.
Optimized heat dissipation design
Guide grooves are designed inside the chain links to reduce the oil temperature rise rate by 20%, avoiding performance degradation caused by overheating.


Anti-skid structure:
The track chain's chain links are designed with anti-skid teeth on the side, which increases lateral friction by 30% on slippery slopes.
Self-cleaning function
A 5mm gap is reserved between the chain links, and the raised structure of the track shoe is used to automatically discharge dirt and debris.
Performance optimization
Significantly improve work efficiency

Stable power transmission
The Komatsu Track Chain is perfectly matched to the drive wheels, reducing slip and ensuring efficient power transmission.
High-strength chain pins and forging process avoid the risk of derailment caused by chain link elongation after long-term use.
Automatic lubrication and long-term sealing pins reduce the frequency of daily maintenance.
Safe and reliable
Optimized chain link gap design absorbs sudden impact loads during operation and reduces the risk of breakage.
Locking track shoe bolts prevent loosening and falling off under vibration conditions.
Some track chain models are equipped with wear indicator marks to facilitate timely replacement of key components.

Intelligent and humanized design
Quick disassembly and assembly structure: convenient for on-site maintenance, saving labor and time costs.
Low-noise operation: Optimized chain link engagement curve reduces metal friction noise and improves operating comfort.
Track chain is compatible with track shoes (flat teeth, grouser teeth, etc.) for different working conditions to meet diverse needs.
track chain Maintenance Method
Visual inspection(per work shift/5 hours)
Track tension:Use a ruler to measure the track sag, the standard value is 30-50mm (at the center of the track roller). Too loose will easily lead to derailment, too tight will increase wear.
Track chain: Check the connections to see if the bolts are loose (torque standard: M30 bolts 1200±50N·m) and whether the lock washers are damaged.
Track shoe wear: Measure the thickness of the track shoe. The wear limit is 70% of the original thickness (standard thickness is about 60mm). If it exceeds this limit, it needs to be turned over or replaced.
Sealing status: Observe whether there is grease leakage at the pin hole of the chain link. If so, the seal has failed and the sealing kit needs to be replaced in time.
Run Check(per work shift/5 hours)
Abnormal noise during movement: When the equipment is moving, monitor the track chain for any abnormal friction or impact sounds, which may indicate wear on the pin sleeve or a foreign object getting stuck.
Deviation test: When walking in a straight line for 10 meters, the deviation should be ≤0.5 meters. Otherwise, the track tension needs to be adjusted or the track rollers need to be checked.
Temperature monitoring: After 2 hours of operation, touch the chain link, the temperature should be ≤80℃ (hand can touch it briefly). Overheating may be due to insufficient lubrication or excessive load.
Regular lubrication (every 25 hours/week)
Centralized lubrication system:Use Komatsu special grease (model: Super UG2, NLGI grade 2, dropping point > 260°C).
Use a grease gun to pressurize the grease nozzle until the old grease is squeezed out. The amount of grease added to each grease point is about 15-20g.
Note: Clean the oil filling nozzle before filling oil to avoid mixing in impurities.
Seasonal maintenance:
Summer (>35℃):
Komatsu track chain increases the lubrication frequency to once every 15 hours and uses high-temperature resistant grease (dropping point > 280°C).
Check the cooling system to ensure that the track oil temperature is ≤90℃. A forced air cooling device can be installed.
Winter (<-20℃):
Replace low-temperature grease (cone penetration ≥ 310, applicable temperature -40℃~+120℃).
Preheat the crawler system before starting, run it at idle speed for 5 minutes, and then move it slowly.
STONE

Stone is a leading supplier of engineering machinery parts, focusing on providing high-quality parts for mining companies. Since its establishment in 2004, we have been based in Shanghai, China, and have built our own brand STONE, becoming a trusted choice in the industry. We are committed to providing a variety of parts including bulldozers, excavators and wheel loaders for well-known brands such as Caterpillar and Komatsu. Our product line covers a full range of OEM parts, such as Track Chain, Track Rollers, Sprocket, Excavator Buckets, Blades, Excavator Cylinders, Swing Circles, and various electrical and hydraulic components to ensure that our customers' stringent requirements for quality and performance are met.
quality
years experience
service
hours warrant
Q&A

What is the service life of the crawler chain of Komatsu PC2000?
A: The service life of a track chain depends on the operating environment, load conditions, and maintenance. Under normal operating conditions (such as moderately hard surfaces and reasonable loads), the track chain on the Komatsu PC2000 typically lasts 5,000-8,000 hours. However, in extreme operating conditions (such as rocky terrain and high-abrasive environments), the service life may be reduced to 3,000-5,000 hours. Regularly checking the tension, clearing debris, and avoiding improper operation can extend the service life.
Can I mix different brands of track chains?
A: It is not recommended to mix and match track chains. Different brands of track chains may have differences in size, hardness and design, which may result in:
Poor matching: accelerated wear or risk of derailment.
What is the material of the Komatsu PC2000 track chain? Is it corrosion-resistant?
Hot Tags: komatsu track chain 21t-32-o0020 for pc2000-8, China komatsu track chain 21t-32-o0020 for pc2000-8 manufacturers, suppliers, factory, bulldozer track chain, digger track chains, Excavator Track Chain, Track Chain, dozer track chains, chain assembly





